The question

"Is Tampa's 35-ft RS-75 principal-structure height limit measured from existing grade, or from the design flood elevation (BFE + freeboard) datum?"

Context: on a FEMA Zone AE lot where the finished floor must sit roughly 4.5 ft above existing grade, the measurement datum decides whether a ~33 ft mirrored Sterling-plan ridge is comfortable or marginal.

What we already know (from the vault)

What the web says

Convergences and contradictions

Synthesis for RDCO

Verdict: the 35 ft runs from the required finished floor, which on this lot is a flood-derived elevation, not existing grade. The ~33 ft Sterling ridge clears, and it clears under every plausible reading. The plan does not need a height redesign.

Run the arithmetic on the lot's actual numbers. The plan as sketched puts the finished floor at 13.0 ft NAVD88 and the ridge roughly 33 ft above the 8.5 ft average grade, which places the ridge at about 41.5 ft NAVD88 and makes the structure itself about 28.5 ft from its own finished floor to ridge. Measured from existing grade, that is 33.0 ft against 35 - 2.0 ft of slack, the uncomfortable number the Sterling note flagged. Measured from a required finished floor of 12.0 ft (BFE + 1), it is 29.5 ft - 5.5 ft of slack. Measured from 11.0 ft (DFE with no freeboard, which is also the technical guide's "required DFE" reading), it is 30.5 ft - 4.5 ft of slack. The worst case across all three readings still clears. Every one of these ridge figures inherits a Ray estimate, not an architect's section, so treat the slack as a range of roughly 4.5 to 5.5 ft under the correct reading and 2 ft under the wrong one.

Two consequences matter more than the verdict. First, the height budget stops being a design constraint. Under the flood datum there is room for taller ceilings, a steeper roof than 5:12, or both - the founder's Mediterranean preference typically wants a lower pitch than Craftsman anyway, so pitch is not the pressure point, but 10-ft and 11-ft ceilings on the main floor now fit inside the envelope. The "taller ceilings or a steeper roof could break it" warning in [[2026-10-17-sterling-plan-fit-and-cost]] should be retired. Second, and less obvious: the datum is the required finished floor, not the as-built one. Elect to build the floor a foot higher than code requires and the ridge rises with it while the datum does not, so voluntary freeboard consumes the 35-ft budget one foot per foot. The prior recommendation to design to 13.0 and price 14.0 for insurance reasons is still right on the money, and it still fits (at a 14.0 floor the measured height lands near 30.5 to 31.5 ft), but the trade is now visible: each elective foot of resilience is a foot of ridge budget. That is a trade worth making at this slack level and worth re-checking if the Hillsborough Coastal Flood Risk Map Update pushes the BFE up, because a higher BFE raises the required floor and therefore lowers the measured height - the map revision moves this constraint in our favor, not against us.

Honest statement of what is not nailed down. The codified §27-43 text read today carries a Municode badge, "Amended by Ordinance No. 2026-49," adopted 6/4/2026 and not yet reflected in the published code version (May 27, 2026). That ordinance's caption amends §27-43 and §27-156 among others; its named subjects are certified recovery residences, parking and setbacks, and nothing in the caption touches height. The amended text itself could not be read - Municode exposes only the caption. Separately, whether a zoning examiner would credit the required floor or the as-built floor when the as-built is higher is a reading of "required," not quoted guidance, and §27-53 makes that a written determination by the zoning administrator. Neither open point threatens the verdict; both belong on the pre-application list.

Single next action: no redesign - add one line to the Zoning Verification Letter / pre-application question list already queued in [[zoning-flood-zone-findings]], asking Construction Services to state in writing (a) the required finished-floor elevation for this parcel in NAVD88 and (b) confirmation that the §27-43 datum is that required floor rather than existing grade. Ray drafts the question list; the founder signs and submits it, since the Zoning Verification Letter application is the property owner's. Nothing else on the Sterling plan waits on this - footprint, garage depth and the missing fifth bedroom are the real redesign items, and they are unaffected.

Why this is in the vault

This closes open item 3 in [[2026-10-17-sterling-plan-fit-and-cost]] ("what the 35-ft height is measured from") and removes height from the list of things that could force a plan change on the Sunset Park rebuild, which frees the architect brief to spend its constraint budget on footprint and ceiling height instead. It also corrects the stale §5-111.6 citation that has been propagating through the home-build notes since July.