Review-and-plan: lifecycle email/SMS (2026-10-27)

2026-10-27·review·status: gated-pass (verify-vault-write ITERATE → 4 fixes applied by parent; D1 counts in finding 1 unverified by the gate)·by review slot
printablesscribble-workslifecycleemailsms

Lifecycle email and text-message review, 2026-10-27

What was reviewed

origin/main @ 46ed046 (68 open PRs, 0 merges since 10-12): workers/daily-playset/src/, src/lib/accounts/plans.js. Issues #224, #331, #413; PR #332 docs/MONETIZATION-PLAN.md. Count-only D1 on scribble-works-accounts (household_plans, deliveries). curl 05:14 ET. queue.md, escalations.md as cited.

Since 10-20

The three queue edits landed (:41, :161, :810); the work did not. No R51 issue exists (newest issue: #413, 10-07); #413 has no comment since 10-08.

Findings

  1. The dead links reached inboxes. Two households get the email, both set to Plus by hand (plans.js:5-7). Of 32 sent 10-11 to 10-26, 9 listed letter-sound-hunt, caceria-de-sonidos, ten-frame-race or carrera-de-marcos-de-diez (latest 10-25; reviewer's count-only D1 query, not re-verified: the gate's re-run was classifier-denied as a production read); all four /game/ pages 404 today. The text part prints each URL (email.js:117). Cause unchanged: the D1 token (escalations.md:591, day 16).
  2. The queue blocks its own R51 step. :41 says "plan-first GH issue now"; :44 says R51 is "BLOCKED, do not slot". Only the flip needs the token. :44's ":135" (the stroke-arrows port) drifted to :150; :135 is now R41.
  3. R41 ("Before #224") is missing from the billing plan. #224's backlog (#325-#331) has no unsubscribe step, yet MONETIZATION-PLAN.md:321-322 says "Preserve ... existing consent/unsubscribe preferences". Today's only opt-out needs a sign-in (email.js:48, :103); send.js:11-14 sets no List-Unsubscribe.

3-5 creation quality (charter:483): untouched.

Proposed queue.md changes

R41/R51 text: engineering (charter:50). Slotting: product (charter:48). Not applied.

@@ -41 +41 @@
-- R51: plan-first GH issue now; the flip waits on escalations.md:591, then first.
+- R51a (unblocked): next non-game slot writes R51's GH issue; comment #413 that phases 4-5 wait on it. The flip waits on escalations.md:591.
@@ -44 +44 @@
-- BLOCKED, do not slot: R51, R53, R56, :135. Close #373 (branch kept): …
+- BLOCKED, do not slot: R51 flip, R53, R56, stroke-arrows port (:150). Close #373 (branch kept): …
@@ -135 +135 @@
-R41. [engineering, M, plan-first GH issue] Daily email: one-click List-Unsubscribe (send.js:13) to a signed pause link. Before #224 (paid plans).
+R41. [engineering, M, plan-first GH issue] Daily email: one-click List-Unsubscribe (send.js:13) to a signed pause link. Before #224 (paid plans); comment it on #331 as an acceptance line (2026-10-27 review).

Decisions needed

  1. D1 catalog token (escalations.md:591), carried; finding 1 adds evidence. Default: wait for his token. Bear: until then, about 1 email in 4 carries a dead link.
  2. None new. /account/ "comes with Plus" is 10-26 decision 1 (R63, queue.md:56).