/decisions · 2026-05-17 · investing · power-layer-v1

Deploy power layer v1 paper trade — go / revise / defer / archive?

Decision logged from the power-cycle thesis. Click an action to fire an iMessage back to the Ray session with the decision encoded.

Power thesis v1 ready for founder gate. Tranche-accumulate TLN+CEG+CCJ basket, no per-trade stops, phase-marker exits, R-unit sizing. Paper-only.

Context

Parallel-v1 paper-trade thesis to the memory bucket. Same operating shape (tranche-accumulate / no per-trade stops / phase-marker exits / R-units), different fundamentals. Power is the Diamandis-named bottleneck layer — $156B of US data-center projects are blocked on power-infrastructure constraints, interconnection-queue wait times are 36–48 months in data-center growth zones, and hyperscalers are now contracting for decade-plus nuclear baseload at premium pricing (Talen-Amazon $18B / 17yr / 1.92GW; Constellation-Microsoft 20yr / 835MW Crane restart).

Full thesis lives at theses/2026-05-17-power-cycle-v1.md.

Locked parameters

TickerLayerMax positionInitial tranche
TLNPure-play nuclear IPP (primary)2.0 R0.5 R ($2,500)
CEGDiversified IPP (proxy)1.5 R0.5 R ($2,500)
CCJUranium + Westinghouse reactor tech0.5 R0.25 R ($1,250)

1 R = $5,000 paper. Bucket cap = 4.0 R (matches memory). Initial deployment = 1.25 R / $6,250.

Phase markers (exit triggers):

  1. PJM + ERCOT annual peak-load growth vs forecast — bearish flip if materially below baseline 2 consecutive annual cycles
  2. Hyperscaler PPA cadence (≥2 deals/yr at >500MW / >10yr) — bearish flip if zero deals in any rolling 4-quarter window
  3. Interconnection-queue backlog (DC growth zones) — bearish flip if wait times drop below 18mo across PJM + ERCOT

Bear-case headline: if a training-efficiency breakthrough drops compute-per-token 10x (a la DeepSeek-R1 propagating to training), hyperscaler capex can flatten without end-user demand dropping — that's what funds the power bucket. Capex line is the load-bearing assumption.

Lock in

Approve — deploy v1

Greenlight paper deployment of TLN + CEG + CCJ at the initial tranche sizes above. Ray fires market orders on next paper-trade window and logs to audit trail.

Approve + send
Revise — return with parameter notes

Thesis shape is right but specific parameters need revisiting. Name which (basket composition, sizing, phase markers, tranche triggers, etc).

Revise + send
Defer — hold for next quarterly review

Don't deploy yet. Push to a specific revisit date (default: next quarterly review = 2026-08-17).

Defer + send
Archive — thesis does not deploy

Power thesis does not pass the deploy gate. File as status: archived-pre-deploy. Name the kill reason for the audit trail.

Archive + send